Tue, Jun 17th, 2025
  • facebook
  • twitter
  • youtube
  • instagram
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
The Tribune Logo
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
Tue, Jun 17th, 2025
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
TRANSPORT
- Azerbaijan
Construction of Barda-Agdam road continues at an accelerated pace-REPORT.AZ

(Read full article on report.az)

The construction of the Barda-Agdam road, one of the projects for the creation of the road infrastructure in the Karabakh and East Zangazur economic regions, continues at an accelerated pace.

Report informs that the length of the Barda-Agdam highway starting in the city of Barda is 45 km. As instructed by the president, the Barda-Agdam highway will be built taking into account the development plan of Karabakh in accordance with the first technical category and will be four-lane.

In some parts of the road, major construction work is coming to an end. At the 25th and 40th kilometers of the road, the construction of two single-arch bridges with a length of 91.3 meters and 18.2 meters is being completed, and at the 41st kilometer – an overpass with a length of 32.2 meters. At the 4th kilometer of the road, the construction of a traffic interchange with a length of 66 meters has begun. At the 29th kilometer of the road, the construction of the Pit stop started.

Feb 8, 2022

DATA SNAPSHOT

BANKS
- Azerbaijan
Fitch affirms Azerbaijan’s Expressbank at ‘B’, outlook Stable
TRADE
- Uzbekistan
Uzbekistan’s foreign trade turnover at $13.15 bln in Q1, 2022
ECONOMY
- Belarus
Belarus inflation up 15.9% yr/yr in March-Statistics Committee
ECONOMY
- Georgia
Remittances to Georgia rise 3% yr/yr to $193 mln in March-central bank
THE TRIBUNE
- Eurasia
The Tribune suspends publication
HEALTH
- Covid-19
COVID-19 Eurasia Roundup
The Tribune keeps you up-to-date with the latest vaccines and infection data across the region.
OPINION
- Kazakhstan
OPINION-Kazakhstan’s Reforms Should Be More Than Just Show-FOREIGNPOLICY
  • facebook
  • twitter
  • youtube
  • instagram
  • Privacy Policy
  • Cookie Policy
  • About Us
  • Contact Us
NEWSLETTER

I have read the privacy policy and consent to the storage of my data in your archive.

© 2021 thetribune.com All rights reserved.