Mon, Jun 16th, 2025
  • facebook
  • twitter
  • youtube
  • instagram
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
The Tribune Logo
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
Mon, Jun 16th, 2025
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
  • HOME
  • BUSINESS
  • POLITICS
  • ECONOMY
  • COUNTRIES
    • Caucasus
      • Armenia
      • Azerbaijan
      • Georgia
    • Central Asia
      • Kazakhstan
      • Kyrgyzstan
      • Tajikistan
      • Turkmenistan
      • Uzbekistan
    • Eastern Europe
      • Belarus
      • Moldova
      • Ukraine
    • Russia
  • OPINION
  • LIFESTYLE
  • FOCUS
ENERGY
- Belarus
23 wells drilled in Belarusian oil fields in the first half of the year-BELTA

(Read the full article on belta.by)

In the first six months of 2021, the teams of the Svetlogorsk Drilling Directorate (SUBR) and the Tower Erection Directorate (VMU) of Belorusneft built 23 wells and installed 22 drilling rigs, BelTA learned from the press service of the enterprise.

So, in June, the team of the tower assembly department installed three drilling rigs on the territory of Belarus. According to Nikolai Smolikov, First Deputy Chief-Chief Engineer of the VMU, the rig builders worked at the Vishanskoye, Beskopylnovskoye and Rechitskoye fields.

Also, last month, 4 sites were prepared for the construction of drilling rigs – at the Tishkovskaya, Vishanskaya, Severo-Domanovichskaya and Ostashkovichskaya areas. “The rigs prepared by the VMF for operation are immediately put into operation. The drillers have already begun construction of new wells on them,” the press service said.

Four wells were drilled in June. Drilling engineer of the production and technical department of SUBR Ivan Daineko noted that the teams worked at the Tishkovskoye, Novo-Davydovskoye, Rechitskoye and Kartashovskoye fields. A well was drilled at the Tishkovskoye field with a depth of 3724 m, at Novo-Davydovskoye – 2920 m, at Rechitskoye – 2891 m. A second wellbore was drilled with a length of 4580 m at the Kartashovskaya area.

Jul 16, 2021

DATA SNAPSHOT

BANKS
- Azerbaijan
Fitch affirms Azerbaijan’s Expressbank at ‘B’, outlook Stable
TRADE
- Uzbekistan
Uzbekistan’s foreign trade turnover at $13.15 bln in Q1, 2022
ECONOMY
- Belarus
Belarus inflation up 15.9% yr/yr in March-Statistics Committee
ECONOMY
- Georgia
Remittances to Georgia rise 3% yr/yr to $193 mln in March-central bank
THE TRIBUNE
- Eurasia
The Tribune suspends publication
HEALTH
- Covid-19
COVID-19 Eurasia Roundup
The Tribune keeps you up-to-date with the latest vaccines and infection data across the region.
OPINION
- Kazakhstan
OPINION-Kazakhstan’s Reforms Should Be More Than Just Show-FOREIGNPOLICY
  • facebook
  • twitter
  • youtube
  • instagram
  • Privacy Policy
  • Cookie Policy
  • About Us
  • Contact Us
NEWSLETTER

I have read the privacy policy and consent to the storage of my data in your archive.

© 2021 thetribune.com All rights reserved.